in PLN millions, unless otherwise stated
As at 31 December 2020 |
As at 31 December 2019 |
|
---|---|---|
Deposit Access Program | 2 420 | 2 048 |
Investment activity related to the development and operation of the Żelazny Most Tailings Storage Facility | 1 133 | 856 |
Construction of the SW-4 shaft | 589 | 595 |
Damówka pumping station with a backwater pipeline in the Tailings Division | 103 | 34 |
Optimisation of the Flash Furnace technology in the Głogów I Copper Smelter and Refinery, STAGE 2 | 65 | 28 |
Modernisation of a recovery boiler at the Głogów I Copper Smelter and Refinery | 58 | 27 |