Integrated Report of KGHM Polska Miedź S.A.
and the KGHM Polska Miedź S.A. Group
for 2020

9.1.1 Mining and metallurgical property, plant and equipment– major fixed assets under construction

in PLN millions, unless otherwise stated

 

As at
31 December 2020
As at
31 December 2019
Deposit Access Program 2 420 2 048
Investment activity related to the development and operation of the Żelazny Most Tailings Storage Facility 1 133 856
Construction of the SW-4 shaft 589 595
Damówka pumping station with a backwater pipeline in the Tailings Division 103 34
Optimisation of the Flash Furnace technology in the Głogów I Copper Smelter and Refinery, STAGE 2 65 28
Modernisation of a recovery boiler at the Głogów I Copper Smelter and Refinery 58 27

Search results